Skip to content

Run 2 ran in orbit on 22 October 2026 - #41

Merged
wbnns merged 1 commit into
mainfrom
opssat/run2-in-orbit
Oct 24, 2026
Merged

wbnns merged 1 commit into
mainfrom
opssat/run2-in-orbit

Conversation

@wbnns

@wbnns wbnns commented Oct 24, 2026

Copy link
Copy Markdown
Member

Docs side of OPS-SAT run 2 (v0.4.0, 22 Oct 2026).

  • News bar points to mru.space № 007.
  • quorum-cli: new 'Run 2, 22 October 2026' section with the FlatSat and orbit rows; sensor and output lines updated; opssat/run described as three segments.
  • Architecture, index, bench, qualification, shrinking-quorum, llms summary: two runs. F´ pages unchanged (F´ has not run on flight hardware).
  • Repository table: flight v0.7.0.

npm run check exit 0 locally (137 passed).

News bar to № 007; llms summary, architecture, quorum-cli (new Run 2 section
and table), index card, bench, qualification and shrinking-quorum pages say two
runs; event list adds stuck bit, outvoted and resumed; flight version v0.7.0.
@wbnns
wbnns merged commit 9c3599b into main Oct 24, 2026
4 checks passed
@wbnns
wbnns deleted the opssat/run2-in-orbit branch October 24, 2026 19:49
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant