Skip to content

Release specification 0.3.0 and stable support packages - #69

Merged
callumalpass merged 2 commits into
mainfrom
release/0.3.0
Nov 15, 2026
Merged

callumalpass merged 2 commits into
mainfrom
release/0.3.0

Conversation

@callumalpass

Copy link
Copy Markdown
Member

Scope

Prepare the first stable specification, dated 2026-11-15, from spec main 47d257d6a56e34c7279e5ebb959af0b0f49744b2 (the untagged rc.6 draft). Follow the rc.4 release precedent: commit documentation, version fields, and lockfiles before tagging. No tags, registry publications, merges, deployments, new tooling, or runtime implementation changes.

  • Fold both rc.5/rc.6 drafts into 0.3.0 without dropping their changelog content; update README, overview, migration/conformance text, and the generated reader's displayed version.
  • Confirm the thirteen provisional choices without changing their rules. Apply the promised nondeterministic-match warning-to-error escalation, excluding invalid types from matching; preserve case IDs and original since: history and add changed: 0.3.0 to the two affected expectations.
  • Prepare npm interop/testbed and the Rust interop crate at 0.1.0. Prepare npm runtime at 0.2.0 because the reference executor and TaskNotes Workflows main consume it. Registry inspection disproves the initial unpublished assumption: runtime 0.2.0-rc.1 already exists under next (latest remains 0.1.0-rc.1).
  • Replace the obsolete ecosystem-wide release contract with the focused release record. Explicitly defer product qualification in the changelog rather than claim that retired implementation evidence proves current runtime conformance. New normative work goes to compatible 0.3.x errata or 0.4.

Stable promises

Confirmed: Chapter 02 path safety, discovered-collision renames, full case folding, Unicode 17.0.0; Chapter 03 YAML scalars; Chapter 04 contract failures as single-record; Chapter 06 regex dialect; Chapter 07 write uniqueness at every validation level, RFC 8785 number text, string path-stored fields/date tokens; Chapter 10 map iteration order; Chapter 12 top-level list operations and scalar-value body offsets.

Applied: nondeterministic match.expr is an error, invalidates its type, and excludes it from matching. Queries may still use time-dependent bindings.

Explicitly deferred: the former prerequisite that every ecosystem implementation hold verified claims, plus registry-install, second-implementation, multi-platform, downstream migration/recovery, provider/host, live-app, audit, and performance qualification. Reason: Callum's specification freeze is independent of product releases, the authoritative runtime has known gaps, and the former contract's legacy-engine evidence is not authoritative. No rc.5/rc.6 tag is required. Companion profiles keep their own versions.

Conformance: FAIL, not a ratchet-green claim

Authoritative Connect origin/main: 17b79aec9b4ce01bcf7d07220c28e48ec16e6f14. Its vendor SOURCE pins exactly spec main 47d257d6a56e34c7279e5ebb959af0b0f49744b2; current sem 1.2 declares rc.6, not stable. Rust compilation used rcargo; no local Rust builds or deprecated-engine evidence.

  • Committed vendor subset: 357/359, two expected failures, exit 0 and zero ratchet violations. Expected failures: paths.discovered_collision, collection.unique_collection_scope.
  • Complete spec-main v0.3 suite via the unchanged adapter: 381/483, 12 mismatches, 90 unsupported adapter operations, exit 1 (124 unlisted cases).
  • Complete prepared stable suite: 379/483, 14 mismatches, 90 unsupported adapter operations, exit 1 (124 unlisted cases plus two regressions). New regressions: cel_match.nondeterministic_match_warning (legacy ID retained) and cel_match.match_deterministic_ok.

Every non-passing case ID, adapter limitations versus demonstrated mismatches, and the exact commands/revisions are in release/conformance-0.3.0.md. No tests were weakened/dropped, no runtime source/vendor/expectations were changed or blessed, and no stable runtime conformance claim is made.

Validation

  • Legacy conformance guardrail; v0.3 checker (213 executed model/schema/migration fixtures and 270 validated adapter-target fixtures); reproducible TaskNotes migration fixture.
  • Standard runtime pack regeneration and generated schema/testbed-asset drift checks.
  • npm install + tests: interop 11, CEL host 15, runtime contracts 5, runtime executor 1, testbed 6.
  • npm package dry runs for interop/runtime/testbed; specification site and v0.2 archive build.
  • Rust interop: 5 tests, fmt check, and packaged-crate compilation/verification via rcargo.
  • Stable marker acceptance/rejection, all thirteen provisional choices, draft-content retention, manifest/lockfile consistency, all 104 non-passing IDs documented, and diff whitespace checks.

Local execution was Linux only. Cross-platform CI, installed-registry smokes, and downstream live applications are not inferred from local results.

Exactly what follows merge — NOT executed here

Use the exact merged release commit throughout:

  1. Tag/push v0.3.0. Existing .github/workflows/ci.yml runs; .github/workflows/deploy.yml (Build tagged specification artifact) uploads mdbase-spec-site-v0.3.0. This does not deploy the product website; mdbase-dev/mdbase.dev imports/deploys it separately.
  2. Tag/push mdbase-interop-v0.1.0. Existing .github/workflows/publish-npm.yml tests/packs/checks unpublished status, then publishes @callumalpass/mdbase-interop@0.1.0 to npm as public/latest.
  3. After interop succeeds, tag/push mdbase-runtime-v0.2.0 and mdbase-testbed-v0.1.0 at the same commit. That workflow publishes @callumalpass/mdbase-runtime@0.2.0 and @callumalpass/mdbase-testbed@0.1.0 to npm as public/latest. Existing workflow logic selects latest for plain SemVer; no trust or workflow changes.
  4. From that tagged revision run cargo publish --locked --manifest-path packages/interop-rs/Cargo.toml for mdbase-interop@0.1.0 on crates.io. There is no crate publishing workflow; the interop tag identifies its source but only publishes npm automatically.

No tags for private packages. Connect must separately re-vendor/qualify/fix its claimed profiles before promoting its supported version. This PR must not merge or publish any downstream implementation.

@callumalpass
callumalpass merged commit 0f10c9e into main Nov 15, 2026
20 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant